메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Mock-up house has been analyzed based on the construction planning and scheduling for practicality of long life housing. The conclusion of the study are addressed as follows. In Support system, the working period of 1 cycle in apartment which was adjusted to FPWS(Flat Plate Wall System) has been decreased to 2 days, and the working period in long life housing has been decreased to 1 day than that was adjusted to bearing wall system (7days). In case of Infill system, the working period in apartment which was adjusted to FPWS(Flat Plate Wall System) has been decreased to 2 days, and the working period in long life housing has been decreased to 9 days than that was adjusted to bearing wall system (30days). The main reason for decreased period might be accepted that the Infill system was taken dry-ondol method process for flooring construction.

목차

Abstract
1. 서론
2. 실험주택(Mock-up House) 개요 및 혼합구조시스템 특징
3. 고정요소와 가변요소의 구분
4. 공정 분석
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-018577680