메뉴 건너뛰기
Library Notice
Institutional Access
If you certify, you can access the articles for free.
Check out your institutions.
ex)Hankuk University, Nuri Motors
Log in Register Help KOR
Subject

The Study of The Disputed Issues During The Soft Ground Shield TBM Design and Construction According to Shield TBM Trouble Case Study
Recommendations
Search
Questions

연약지반 쉴드 TBM 트러블 사례분석을 통한 설계ㆍ시공시 주요 쟁점사항에 대한 고찰

논문 기본 정보

Type
Proceeding
Author
Sung-Yil Koh (단우기술단) Sung-Ju Kwon (단우기술단) Seok-Yeon Choo (단우기술단) Yong-Man Kim (포스코건설)
Journal
The Korean Society For Railway 한국철도학회 학술발표대회논문집 한국철도학회 2010년도 정기총회 및 추계학술대회
Published
2010.10
Pages
2,362 - 2,371 (10page)

Usage

cover
📌
Topic
📖
Background
🔬
Method
🏆
Result
The Study of The Disputed Issues During The Soft Ground Shield TBM Design and Construction According to Shield TBM Trouble Case Study
Ask AI
Recommendations
Search
Questions

Abstract· Keywords

Report Errors
Shield TBM method can make the tunnel structure safely in the very poor condition ground without the settlement influence. Shield TBM application case have been increase because the shallow tunnel necessity is increased due to concentrate the population in urban area, increase the price of land, protect the environment etc.
In this study, we introduce the special purpose and condition shield TBM to the understand the shield TBM technique development situation. And through the study of the shield TBM trouble and accident case, we propose the major disputed issues during the soft ground shield TBM design and construction.

Contents

No content found

References (0)

Add References

Recommendations

It is an article recommended by DBpia according to the article similarity. Check out the related articles!

Related Authors

Frequently Viewed Together

Recently viewed articles

Comments(0)

0

Write first comments.

UCI(KEPA) : I410-ECN-0101-2012-326-003866620