메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
Daisuke Hirotani (Hiroshima University) Katsumi Morikawa (Hiroshima University) Katsuhiko Takahashi (Hiroshima University)
저널정보
대한산업공학회 Industrial Engineering & Management Systems Industrial Engineering & Management Systems 제10권 제3호
발행연도
2011.9
수록면
197 - 202 (6page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
In traditional production lines, such as assembly lines, each worker is usually assigned to a particular fixed work, and decreasing the task to master the assigned work is valuated. However, when an imbalance exists between workers" speeds, if a worker delays the overall work in the production line, the production rate of the particular line will also decrease. To avoid this problem, the "Self-Balancing Production Line" was introduced. In this type of production line, each worker is assigned work dynamically, and when specific conditions are satisfied, production remains balanced. Characteristics of these lines that can be preempted at any place have already been analyzed by some researchers. A previous paper examined the situation in which only a single worker can process one machine and cannot preempt processing, and the improved policy of an ordinary self-balancing production line, which specifies which stations workers can process and how workers can behave.This policy achieveda high production rate with only four stations and two workers (Buzacott, 2002). In that paper, worker processing stations and the behavior of a specific worker were limited, andthe paper focused only on specific stations and workers. Therefore, it is not applicable to any worker sequence. In this paper, we focus on other ways to decrease cycle time. In this kind of line, a worker processes at his or her speed. Therefore, if a worker is assigned stations according to his or her speed, the line can decrease cycle time. To do so, we relax the assumptions of this type of line and set a new condition. Under these conditions, we compare our results to the results of previous papers.

목차

Abstract
1. INTRODUCTION
2. THE PRODUCTION LINE
3. NEW WORKER POLICY
4. NUMERICAL EXAMPLE
5. CONCLUSION
REFERENCES