메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
Yasuhiro Hirakawa (Tokyo University of Science) Aya Ishigaki (Tokyo University of Science)
저널정보
대한산업공학회 Industrial Engineering & Management Systems Industrial Engineering & Management Systems 제10권 제2호
발행연도
2011.6
수록면
134 - 139 (6page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
The problem of scheduling in permutation flowshops has been extensively investigated by many researchers. Recently, attempts are being made to consider more than one objective simultaneously and develop algorithms to obtain a set of Pareto-optimal solutions. Varadharajan et al. (2005) presented a multi-objective simulated-annealing algorithm (MOSA) for the problem of permutation-flowshop scheduling with the objectives of minimizing the makespan and the total flowtime of jobs. The MOSA uses two initial sequences obtained using heuristics, and seeks to obtain non-dominated solutions through the implementation of a probability function, which probabilistically selects the objective of minimizing either the makespan or the total flowtime of jobs. In this paper, the same problem of heuristically developing non-dominated sequences is considered. We propose an effective heuristics based on simulated annealing (SA), in which the weighted sum of the makespan and the total flowtime is used. The essences of the heuristics are in selecting the initial sequence, setting the weight and generating a solution in the search process. Using a benchmark problem provided by Taillard (1993), which was used in the MOSA, these conditions are extracted in a large-scale experiment. The non-dominated sets obtained from the existing algorithms and the proposed heuristics are compared. It was found that the proposed heuristics drastically improved the performance of finding the non-dominated frontier.

목차

Abstract
1. INTRODUCTION
2. TWO-OBJECTIVE PERMUTATIONFLOWSHOP SCHEDULING PROBLEM
3. BASICS OF SA IMPLEMENTED IN THE CURRENT STUDY
4. SET OF PARETO-OPTIMAL SOLUTIONS OBTAINED FOR PROBLEM 1 OF SIZE (20×20) GIVEN BY TAILLARD (1993)
5. EFFECT OF THE NEIGHBOURHOOD STRUCTURES
6. EFFECT OF THE INITIAL SEQUENCE AND WEIGHT SETTING
7. PERFORMANCE OF THE PROPOSED SA SEAECH METHOD
8. CONCLUSION
REFERENCES

참고문헌 (6)

참고문헌 신청

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2013-530-003635845