1000MW USC(Ultra Super Critical) fossil power plant has been constructed using korean technology for the first time. It is critical to construct the plant in time due to increasing power demand. In order to reduce trial and errors during commissioning, operator training and pre-verification of control logic are required. In this paper, the simulator for BOP(Balance Of Plant) system of 1000MW USC fossil power plant was developed.