메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
It is well-known that the resources for tide and tidal current energy are abundant in Korea. The south coast in Korea is recognized as one of the most appropriate places in the world for developing tidal current energy. The target site for harnessing tidal current energy is the Uldolmok, where the strongest tidal current in Korea occurs. In order to commercialize and industrialize the tidal current power generation, the construction of pilot tidal current power plant of 1MW has been started in April 2006, and is expected to be completed by May 2007. Extensive works including field investigation, field experiment for evaluating the efficiency of helical turbine and numerical analysis have been performed. This paper present the several design parameters for constructing the Uldolmok pilot tidal current power plant.

목차

등록된 정보가 없습니다.

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0