메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
박문선 (중앙대학교) 김용수 (중앙대학교)
저널정보
대한건축학회 대한건축학회 논문집 - 구조계 大韓建築學會論文集 構造系 第31卷 第3號
발행연도
2015.3
수록면
53 - 62 (10page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

이 논문의 연구 히스토리 (2)

초록· 키워드

오류제보하기
The purpose of this study is to suggest a cost analysis model based on risk factors that can be used in the gas plant construction industry. The research method of this study is to examine and analyze construction stage details of five construction companies with experience of gas plant construction, and construction stage risk factors of domestic construction industry, domestic research institutions, and foreign institutions. In addition, a cost analysis model is suggested by using Fuzzy analysis and Monte Carlo simulation. The results of this study are as follows: First, construction stage details of five construction companies with experience of gas plant construction were examined and analyzed, and through this, a cost breakdown structure (1 Level∼4 Level) is suggested. And construction stage risk factors of domestic construction industry, domestic research institutions, and foreign institutions were examined and analyzed, and through this, 16 risk factors were drawn from domestic construction industry, 18 from domestic research institutions, and 16 from foreign institutions, and finally 28 risk factors were drawn after rearrangement. Second, triangular distribution is applied based on the construction stage cost breakdown structure and the risk factors, and here, with Fuzzy analysis, minimum and maximum values of the risk factors were analyzed and drawn through interviews with experts, and with Monte Carlo simulation, the risk factors were applied to the cost breakdown structure through interviews with experts, and the result values drawn through Fuzzy analysis were also applied to the cost breakdown structure. Additionally, as a result of verifying the cases with an analysis tool, @Risk, through the method above, it could be found that among the cost items reflecting the risk factors, construction cost, outsourcing cost, construction equipment cost, site management cost, water, light, and heat expenses, and safety management cost show cost variability through the bidding feasibility analysis model of this study.

목차

Abstract
1. 서론
2. 이론적 고찰
3. 가스 플랜트 시공단계 비용분류체계 조사 및 도출
4. 가스 플랜트 시공단계 위험요인 조사 및 도출
5. 위험요인을 고려한 비용분석 모델 제시
6. 결론
참고문헌

참고문헌 (20)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2016-540-001279398