메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
하체웅 (Korea Hydro & Nuclear Power Co)
저널정보
대한전기학회 전기학회논문지 전기학회논문지 제68권 제2호
발행연도
2019.2
수록면
241 - 246 (6page)
DOI
10.5370/KIEE.2019.68.2.241

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

이 논문의 연구 히스토리 (12)

초록· 키워드

오류제보하기
APR1400 NRC(Nuclear Regulatory Commission) DC(Design Certification) project was undertaken as a part of the UAE Nuclear Business. Nonetheless, The project is a key factor to construct and operate nuclear plant in the USA. If APR1400 acquires DC from the NRC, KHNP will be possible to take firm foothold in the USA, and to increase significantly in the technical competitiveness in overseas export of korea-type nuclear power plant. APR1400’s electrical power system is designed as follows. Not only Offsite but also onsite power systems are supplied to provide electrical power to unit auxiliaries that are necessary during normal operation and the RPS(Reactor Protection System) and ESF(Engineered Safety Feature)s that are necessary in abnormal and accident conditions. The offsite power system comprises of transmission lines, transmission line towers, switchyard components and a control system, transmission tie lines, main generator, generator circuit breaker(GCB), main transformer, unit auxiliary transformers(UATs), and standby auxiliary transformers(SATs). Under normal operating conditions, the main generator supplies power to the main transformer and UATs through an isolated phase bus and the GCB. The UATs are linked to the isolated phase bus between the GCB and main transformer.
The onsite power system for the unit auxiliaries consists of four emergency diesel generators(EDGs), an alternate alternating current(AAC) gas turbine generator(GTG), and two onsite power distribution systems. The onsite power distribution system is linked to the site-specific switchyard via two separate and independent transmission tie circuits. One circuit is linked to the switchyard through the main transformer and UATs, and the other circuit is linked to the switchyard via the SATs.
During normal operation, onsite power is supplied from the main generator through the UATs. During startup and shutdown, the GCB is open, and the onsite power is supplied from the transmission system through the main transformer and UATs.

목차

Abstract
1. 서론
2. Class 1E 교류 전원계통
3. Class 1E 직류 및 필수 전원계통
4. 배치설계
5. 4EDG 적용에 따른 RG 1.155 Target Reliability 분석
6. 전기 배관에 대한 방화 랩핑 최소화
7. 결론
References

참고문헌 (8)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2019-560-000438237