메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
한국산업경영시스템학회 산업경영시스템학회지 산업경영시스템학회지 제41권 제1호
발행연도
2018.1
수록면
102 - 109 (8page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색

초록· 키워드

오류제보하기
This paper seeks to present a multi-control method that can contribute to effective control of the production line with multiple bottleneck processes. The multi-control method is the production system that complements shortcomings of CONWIP and DBR, and it is designed to determine the raw material input according to the WIP level of two bottleneck processes and WIP level of total process. The effectiveness of the production system developed by applying the multi-control method was verified by the following three procedures. Raw material input conditions of the multi-control method are as follows. First, raw materials are go into the production line when the number of the total process WIP is lower than established number of WIP in total process and first process is idle. Second, raw materials are introduced when the number of WIP of two bottleneck processes is lower than the established number of WIP of each bottleneck process. Third, raw materials are introduced when the first process and in front of bottleneck process are idle even if the number of WIP in the total process is less than established number of WIP of the total process. The production line with two bottleneck processes was selected as the condition for production environment, and the production process modeling of CONWIP, DBR and multi-control production method was defined according to the production condition. And the optimum limited WIP level suitable for each system was obtained by applying a genetic algorithm to determine the total limited number of WIP of CONWIP, the limited number of WIP of DBR bottleneck process, the number of WIP in the total process of multi-control method and the limited number of WIP of bottleneck process. The limited number of WIP of CONWIP, DBR and multi-control method obtained by the genetic algorithm were applied to ARENA modeling, which is simulation software, and a simulation was conducted to derive result values on the basis of three criteria such as production volume, lead time and number of goods in-progress.

목차

등록된 정보가 없습니다.

참고문헌 (12)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0