메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
G. Y. Hsiung (National Synchrotron Radiation Research Center) C. C. Chang (National Synchrotron Radiation Research Center) Y. C. Yang (National Synchrotron Radiation Research Center) C. H. Chang (National Synchrotron Radiation Research Center) H. P. Hsueh (National Synchrotron Radiation Research Center) S. N. Hsu (National Synchrotron Radiation Research Center) J. R. Chen (National Synchrotron Radiation Research Center)
저널정보
한국진공학회(ASCT) Applied Science and Convergence Technology Applied Science and Convergence Technology Vol.23 No.6
발행연도
2014.11
수록면
309 - 316 (8page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
A large particle accelerator requires an ultrahigh vacuum (UHV) system of average pressure under 1×10<SUP>-7</SUP> Pa for mitigating the impact of beam scattering from the residual gas molecules. The surface inside the beam ducts should be controlled with an extremely low thermal outgassing rate under 1×10<SUP>-9</SUP> Pa.m³/(s.m²) for the sake of the insufficient pumping speed. To fulfil the requirements, the aluminum alloys were adopted as the materials of the beam ducts for large accelerator that thanks to the good features of higher thermal conductivity, non-radioactivity, non-magnetism, precise machining capability, et al. To put the aluminum into the large accelerator vacuum systems, several key technologies have been developed will be introduced. The concepts contain the precise computer numerical control (CNC) machining process for the large aluminum ducts and parts in pure alcohol and in an oil-free environment, surface cleaning with ozonized water, stringent welding process control manually or automatically to form a large sector of aluminum ducts, ex-situ baking process to reach UHV and sealed for transportation and installation, UHV pumping with the sputtering ion pumps and the non-evaporable getters (NEG), et al. The developed UHV technologies have been applied to the 3 GeV Taiwan Photon Source (TPS) and revealed good results as the expectation. The problems of leakage encountered during the assembling were most associated with the vacuum baking which result in the consequent trouble shootings and more times of baking. Then the installation of the well-sealed UHV systems is recommended.

목차

I. Introduction
II. Construction of the 14 m Arc-cell Vacuum System
III. Transportation and Installation of the 14 m Vacuum Systems
IV. Conclusions
References

참고문헌 (11)

참고문헌 신청

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2019-420-001275380