논문 기본 정보

자료유형
학위논문
저자정보

이도원 (경상대학교, 경상대학교 대학원)

지도교수
윤석헌
발행연도
2020
저작권
경상대학교 논문은 저작권에 의해 보호받습니다.

이용수6

표지
AI에게 요청하기
추천
검색

이 논문의 연구 히스토리 (2)

초록· 키워드

오류제보하기
Recently, various procurement methods have changed. And decision-making at the beginning of a business lacking information regarding bidding is being made. Thus the importance of conceptual estimate , which are the basis for decision making, is increasing. In addition, the necessity of the construction and remodeling of school facilities is increasing. However, in the existing research, there is little analysis of school facilities. In addition, research on space classification, usage and analysis of main materials is important in the initial project construction cost estimation but insufficient. So, the purpose of this study is to construct interior work packages for calculating interior finishing work by analyzing the existing BoQ document and quantity statement of the school facilities and correlating the space, site, and work information used at the cost estimation phase. Conceptual estimation research method using interior work package is as follows. First of all, through theoretical considerations, the concept and scope of the estimate and interior finishing work are summarized. Secondly, the composition of the spaces, parts and finishing materials are classified according to quantity calculation sheet of the finishing work. The space composition according to the space classification by use, reconstruction of the finishing work, and the main material of the space are constructed. This configuration constitutes a interior work package. Third, the finishing materials are constructed according to the interior work package and the estimated construction costs are calculated through Monte Carlo simulation of the finish. Conceptual cost estimates are calculated by applying the estimated construction costs. Fourth, the estimated cost is applied to the case school and compared with the actual amount. This method can verify conceptual cost estimates. The analysis results indicate that it is possible to apply it to the approximate cost estimate of the basic design stage, but it is deemed necessary to review the detailed impact factors for application to the detail design stage.

목차

Ⅰ. 서 론 1
1. 연구의 배경 및 목적 1
1) 연구의 배경 1
2) 연구의 목적 2
2. 연구의 범위 및 방법 3
3. 기존문헌 조사 4
Ⅱ. 이론적 고찰 7
1. 견적의 프로세스 7
2. 개산견적의 개념 8
1) 개산견적의 정의 및 범위 8
2) 개산견적 모델 10
3) 개산견적의 정확도 범위 10
3. 내부마감공사의 개념 11
Ⅲ. 마감공사 패키지 구성방안 13
1. 마감공사 패키지 13
2. 마감공사 패키지 구성방법 14
3. 학교 공간구성분류 15
4. 마감공사 부위구성 사례 18
5. 마감공사 패키지 구성 사레 19
6. 마감공사 패키지 재료 구성정리 21
7. 소결 22
Ⅳ. 마감공사 패키지 개산견적 24
1. 마감공사 패키지 개산견적 프로세스 24
2. 마감공사 패키지 개산견적 산출방안 25
3. 마감공사 패키지 개산견적 금액산출 사례 26
4. 마감공사 패키지 개산견적 산출범위 28
5. 마감공사 패키지 검증 30
6. 소결 37
Ⅴ. 결론 및 향후 연구과제 39
1. 결론 및 기대효과 39
2. 향후 연구과제 41
참고문헌 42