The purpose of this study is to analyze the application of the contingency for price fluctuation. This study examined problem of illogicalities in contract clauses for government project in Korea. There is a tendency that the construction projects have begun to lengthen by complexity and size. This long term projects generate many claims for appropriate coverage in accordance with price fluctuation. However, the contract clauses for government project in Korea made in 1978 when the price fluctuation was 11.7%. This clause is not appropriate to the present. In order to reduce the claims arise by price fluctuation, it's needed the application of the Contingency. This answer gives the equality to the contractor and the owner, besides. gives the introduction of contingency in the construction project by step-by-step.

목차

Abstract
1. 서론
2. 예비적 고찰
3. 현행실태분석
4. 물가상승에 관련한 예비비제도의 단계적 적용
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-016517500