메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Recently, according to the applying of sale after building system, it is forecasted that a lot of changes in housing construction. Especially, since it is expected that the change of the system makes a great different conditions in the construction supervision system which is necessary to keep the quality of housing construction, the needs of improving strategies for construction supervision system to adapt the changed system are requested. To achieve this purpose, we selected one of the most affectable factor which could be affected by change of system among the 4 factors of construction supervision system: the assignment of supervisor, the arrangement of supervisor, the business of supervisor, and the standard of supervision cost. In this article, we suggested improving strategies to solve problems of existed system and to adapt change of system using the SWOT analysis.

목차

Abstract
1. 서론
2. SWOT분석을 위한 환경 분석
3. SWOT분석을 통한 전략도출
4. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-014971319