메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
박준호 (Korea Land and Housing Corporation) 이동건 (Korea Land and Housing Corporation) 강유나 (Korea Land and Housing Corporation) 박지영 (Korea Land and Housing Corporation)
저널정보
한국생태환경건축학회 KIEAE Journal KIEAE Journal Vol.20 No.2(Wn.102)
발행연도
2020.4
수록면
153 - 159 (7page)
DOI
10.12813/kieae.2020.20.2.153

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Purpose: The majority of long-life housings in Korea are generally evaluated as wall structures, and there are no realities of apartments that use column-structures such as the flat-plate and rahmen structures. In order to secure the highest and highest grades of certification for long-life housing, a durable and flexible column structure must be applied. However, there is no evaluation of excellence or best due to the problem of rising initial construction costs. Therefore, many problems can occur when there is no basic data for structure construction of a column structure apartment. In this study, we demonstrated a column structure using a rahmen structure and a flat-plate structure, compared the productivity and process with a wall structure, and obtained basic data of a long-life housing using a column structure to be constructed in the future. Method: The productivity of Form work, rebar, and concrete for structure work was analyzed by monitoring building of each of the wall structure, the rahmen structure, and the flat plate structure. Through the work process analysis, it analyzes the further cycle-time of the pillar structure, and tries to analyze the work process. Result: As a result of the productivity analysis, it was found that the productivity of rebar and concrete was not difference as that of the wall structure, but the productivity of the Form work was lower than that of the wall structure. As a result of the process analysis, it was found that the wall-structured structure appeared for 8 days, the flat plate structure for 9 days, and the rahmen structure for 11 days.

목차

ABSTRACT
1. 서론
2. 골조공사 생산성 및 공정 분석
3. 골조공사 생산성 및 공정 분석 결과
4. 결론
Reference

참고문헌 (6)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0