PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

목차

등록된 정보가 없습니다.

참고문헌 (22)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0